Skip to content
SHAPP
Request a demoTry for free

The SHAPP blog

Practical guides for builders in Belgium. Every article is published in French and in English.

RSS feed
  1. 9 min read

    Estimate vs Quote: What Contractors Should Send, and When

    The homeowner asks for a number on WhatsApp before anyone has seen the tub. The range and the quote do different jobs.

  2. 9 min read

    How to Write a Construction Quote, With a Worked Example

    The wall between the kitchen and the living room has to come out. The quote says what is included before anyone talks price.

  3. 6 min read

    What a Belgian quote must include, and the purchase order after a deposit

    5 details on the quote, 8 on the purchase order once a homeowner pays a deposit. The FPS Economy list, article by article, and where each detail goes in SHAPP.

  4. 10 min read

    How to Write an Estimate On Site From Your Phone

    The homeowner asks for a number in the driveway. The gutter job gets priced in the truck, before the engine starts.

  5. 9 min read

    Following up a quote on WhatsApp: 4 messages to copy

    A quote with no reply is rarely a no. 4 messages in the thread, from day 2 to the close, each naming the quote and asking one question.

  6. 11 min read

    AI quotes from a voice note: how they work, what to check

    You talk through the room in the truck. The draft comes back with your tasks, and the ceiling is usually the first number to put right.

  7. 14 min read

    Quoting software for Belgian builders: how to choose

    Pick a tool that can hold Belgian rules. Then pick it for the place the quote really gets written: a desk, an app, or WhatsApp.

  8. 7 min read

    How to send a quote from WhatsApp

    The hall-bath quote can leave from the truck, once the lines are read, as a PDF, a link or an email.

Quote templates by trade

Every building trade has a quote priced by Shappy, using your rates.