Construction Job Management: 9 Steps, Site Visit to Invoice

The balance is open on the truck seat, and the yes on the towel warmer is not in a photo or a text.

8 min read

Contents
  1. What are the steps of construction job management?
  2. The site visit and the quote
  3. Acceptance and the deposit
  4. Orders and deliveries
  5. During the work
  6. Closing the job
  7. The same job with Shappy, in WhatsApp
  8. Common questions

The contractor is in his truck in a driveway in Austin, writing the final invoice for a bathroom remodel. The client asked for a towel warmer while the shower membrane was still tacky, and she said yes from the hall. The photo of that wall is not in the file, and neither is the text.

What are the steps of construction job management?

A small job takes 9 steps: the request and the site visit, the quote, acceptance and the deposit, supplier orders, getting ready to start, the work and the record, changes, the walk-through with the client, then the invoice and closing the file. Each step ends with something written down. On this bathroom the first quote is 9,200 before tax.

Step What you have when it ends Where it slips
1. Request and site visit Measurements, photos, notes on the room Photos stuck in the phone
2. Quote Priced quote from your own rates, margin noted aside An old rate pasted in, margin never written
3. Acceptance and deposit Accepted quote, deposit invoice, dates noted A spoken yes, and no deposit invoice
4. Supplier orders One order per supplier The order placed from memory
5. Getting ready to start Dates confirmed, access and protection sorted A start date promised before the deposit
6. The work and the record Photos of what will be covered, in the file Photos lost in the camera roll
7. Changes Version 2 written, version 1 kept, approval noted The extra agreed by voice
8. Walk-through with the client Punch list, walked with her Leaving on a vague "looks good"
9. Invoice and close the file Balance invoice and the full file The invoice uses the first total

The tub comes out, a walk-in with no curb takes its place, tile goes on the walls and the floor, and a vanity replaces the pedestal.

The site visit and the quote

A curbless walk-in needs the right floor height. The old tub sits on a built-up pad, the door swings over a threshold that is already tight, and a walk-in with no curb only works if that floor can drop or the door can be cut. The contractor sees that conflict when the demo starts and the pan is in the hall. The tape gets the ceiling height, the door swing and the center of the valve. The tile the client saved goes on the quote after that height is written down.

Pictures from the visit are of the substrate, the black joint at the tub, the cement board gone soft behind the valve, the floor that sounds hollow beside the pedestal. Each one is a line on the quote, demo, new backing, or membrane carried higher than a standard surround. They belong in the file that evening, the measurement written next to them. Left in the camera roll, between a fuel receipt and the house across town, they are missing the day the client asks why the price moved.

The tile price, you take from the rates already used on this kind of room. How a line gets from cost to the number on the page is in how a line price gets built, and the measurements taken before the truck moves are quoting from the driveway. Margin on each line stays on the company copy, and the quote the client receives shows the line price.

A quote copied from a tub-for-tub swap usually skips that floor work, and the total still looks serious. Here the quote that goes out covers demo, the membrane, the tile and the vanity. How those lines sit on the page follows a quote laid out line by line. The contractor writes the threshold height down before the quote goes out, because without that figure the pan may not clear the door.

Acceptance and the deposit

The client says yes in the thread at night. The yes that moves the schedule is the one that sends the deposit invoice the same night, with the amount, what it covers and when it is due. 30% of 9,200 is 2,760 before tax, which is what releases the tile and the vanity. Tax depends on the job and where the work sits, and it is added on top of these figures.

How that percentage is figured, including the jobs where 30% falls short of the cash that has to go out first, is in when the deposit is due, and on what. On this room the tile and the vanity leave the account before a single tile is set, so the deposit is sized to that order.

The contractor sets the start once the deposit is in the account, not on the yes in the hallway.

Naming a demo day the evening the client says yes, out by the truck, locks a date before the money is in. If the deposit takes 4 days, the start slips by those 4 days, before the tub is out. The contractor waits for the deposit, then he confirms the day, the arrival time, and that the room and the hall are cleared.

Without the deposit, the contractor pays for the tile out of his own pocket. If he waits to order, the lot the client picked can sell out.

Orders and deliveries

Tile, vanity and valve each get their own order. One text that says "same as the quote" scrambles the model numbers, and the vanity arrives too wide to hide the trap. On the tile order the contractor writes the sku, the caliber, the shade, the box count and the room. 14 boxes cover the walls and the floor.

The count happens on the sidewalk, and the contractor counts the boxes before the driver leaves. 12 boxes are on the truck, 2 are still at the yard. The slip he keeps says 12 received out of 14, missing sku written on it. A stamp that only says received never names the gap. Those 2 boxes look minor while the cartons stay taped. On install morning the back wall stops halfway, and a fill-in from another lot is a different caliber. The client sees the shade difference on the finished wall. The count takes longer than the driver wants to wait, and the missing boxes show up on the sidewalk.

The note to the yard goes the same day, while a fill-in can still come from the same lot and before the install stalls. How that note is written is in the note to the yard that came up short. He attaches the photo of the marked slip and the order number. A chase sent after the wall is closed finds the different caliber already set.

During the work

What the tile will hide gets photographed first: membrane in the corners, the band where floor meets wall, the valve outlet, the cable pulled for a fixture on that wall. The pictures go into the file the same day. In the camera roll they sit with the rest of the week. If the membrane photo waits until evening, the tile goes on the next morning and the file has no picture of the waterproofing. A leak under the tile is then discussed without that picture.

Halfway through, the client wants a towel warmer on the side wall. It is electric, so it needs a cable and a box in one exact spot, before that wall is tiled. Writing 450 on a notepad leaves the line unwritten. Version 2 carries the line, at 9,650 before tax, and version 1 stays in the file. She accepts version 2 in the thread, in writing, before the wall is opened. A yes tossed over while the buckets get rinsed has no amount and no location on it.

The contractor leaves that wall closed until version 2 is accepted. Installing first and pricing after puts the company in the position of asking, with the cable already buried, while the client compares the new total with the one on the first quote.

Closing the job

The walk-through is in the room, lights on, vanity door open, with the client. The contractor writes what is left: silicone at the foot of the vanity, a tile edge proud in the niche, a door that rubs, grout haze on the valve. Next to each item he writes who comes back. Walking out on "looks good" in the hall leaves those items for a text the next day.

The final invoice starts from version 2. 9,650 minus 2,760 is 6,890 before tax. If the invoice uses 9,200 and only takes off the deposit, the 450 for the towel warmer stays with the company, even though the unit is on the wall and the cable was pulled. He puts the math on the invoice, accepted total, deposit already billed, balance, so the client can run the same subtraction on her phone.

What stays in the file is both versions of the quote, the photos from before the tile, the slip that says 12 boxes out of 14, the deposit invoice and this final invoice. Peppol e-invoicing is included, and both the deposit and the balance go out that way. When the client calls because a joint has gone yellow, the contractor opens that file.

The same job with Shappy, in WhatsApp

Back in the truck he sends a voice note, with the tub still in the picture. Shappy drafts the quote from that note and that photo, using the prices already saved for this kind of room. He reads the lines on the phone, and nothing goes out without his yes. The PDF follows by email or by a link.

The client accepts in the thread, the 30% deposit invoice is prepared there, and the later message asking for the towel warmer produces version 2 while the earlier version stays on file. On delivery day he counts boxes on the sidewalk, the follow-up goes to the supply house before the morning the setter would be stuck, and the membrane photos land in the file.

He starts in WhatsApp, on the phone or the computer, with no account to create. SHAPP runs the job from the site visit through the invoice, and Shappy handles the paperwork from that thread: the path is on the job, from the site visit to the invoice, and the day-to-day thread is in running the file in WhatsApp.

For the next job, the message is ready: Hi Shappy, I want to run my next job from site visit to invoice.

On the next walk-in, the voice note and the photo go into the thread before the truck leaves the driveway. If the client adds a towel warmer along the way, it gets its own lines the day she asks.

Common questions

What is the difference between site tracking and job management?

Site tracking watches what is happening in the room. Job management is the whole file, from the first call through the final invoice, with something written down at each step. On the bathroom, tracking sees the tile going up, and job management still has the towel warmer at 450 on version 2.

What documents should you keep for each job?

Version 1 of the quote, version 2, photos of what will be covered, the delivery slip, the deposit invoice and the final invoice. On this room the slip has to say 12 boxes received out of 14. Without those pages the balance gets rebuilt from memory on the last day.

When should you ask for the deposit?

When the client accepts the quote, before the orders go in. On the bathroom, 30% of 9,200 is 2,760 before tax, and that amount leaves as a deposit invoice the day she says yes. Start dates wait until that money is actually in.

What do you do when the client changes their mind mid-job?

Write version 2, keep version 1, and wait for a written yes before installing the extra. The towel warmer adds 450, so the quote moves from 9,200 to 9,650 before tax. A yes in the hallway, with no version 2, is gone on invoice day.

Can you run your jobs from your phone?

Yes. A voice note in WhatsApp starts the quote with the prices already on file, and the rest of the job, deposit included, stays in that same thread. Shappy drafts the documents, the send waits for the company’s yes, and there is no account to create by hand.