Construction Quote Example: 2 Real Quotes, Line by Line

The last quote on the truck seat was 1 line, basement finish at $38,000, and the homeowner had asked to see an example before anyone walked the stairs.

9 min read

Contents
  1. What does a good construction quote example look like?
  2. Example 1: a 1-day drywall repair, 6 lines
  3. Example 2: a 650 sq ft basement finish, by phase
  4. The exclusions and assumptions under example 2
  5. What changes between the 2 examples
  6. 5 mistakes these examples avoid
  7. Getting your own quote in this shape from WhatsApp
  8. Before the next basement, write the exclusions before you write the prices. Do that in the truck. A 1-line total is how the $38,000 quote ended up on the seat, and the next quote you send should carry the lines, the date and the trigger for the deposit.
  9. Common questions

The last quote on the truck seat was 1 line, basement finish at $38,000, with no scope under the number. The homeowner had asked, before anyone walked the stairs, whether they could see an example of the quotes this company actually sends. A single line answers the price and nothing else. It does not say what the 650 sq ft includes, what happens if the wall is wet, or when the money is due.

What does a good construction quote example look like?

A good construction quote example shows the header, the scope, lines with quantity times unit times price, the exclusions, a total plus a sales tax line, the deposit and the schedule, a validity date, and a place to accept. The reader can check any line with a calculator.

The 2 quotes below use the prices of the jobs they describe. They are not a market average, and they are not a price per square foot you should copy onto the next house. The method is the part worth keeping: how the lines are cut, what is written under them, and how the money is staged. How those parts get written, before any table, is in how to write a construction quote.

Example 1: a 1-day drywall repair, 6 lines

A hallway ceiling took water from a bathroom above it. The stain is about 32 sq ft, the joists above it are dry, and the homeowner wants the patch painted before guests arrive on Saturday. Stock drywall is already on the truck. The quote is 6 lines, in the order of the day.

Ref Description Qty Unit Unit price Total
1.1 Protect floors and furniture 1 lot 85 85
1.2 Cut out damaged drywall 32 sq ft 3.50 112
1.3 Drywall patch, tape and mud 32 sq ft 4.25 136
1.4 Prime the patch 32 sq ft 1.25 40
1.5 Paint the patch, 2 coats 32 sq ft 2.00 64
1.6 Cleanup and haul-away of the cutout 1 lot 75 75
Total before sales tax 512

85 plus 112 is 197, the patch of 136 brings the running total to 333, and primer, paint and cleanup then land the quote at 512 before sales tax. Sales tax sits on its own line, at the rate for that state and that kind of work. The amount stays off the quote until the rate for this address is known.

Protection is a lot because the plastic, the tape and the hour to lay it do not scale in a way a homeowner can divide. The cutout, the patch, the primer and the paint stay by the square foot, so 32 times 3.50 is a number anyone can redo on a phone. Cleanup is a lot again: the dump run is the same whether the patch is 20 sq ft or 32. The homeowner pays 512 when the paint is dry and the plastic is down. Material was already on the truck, so this repair asks for no money at the start of the day. The price holds for 14 days.

Paint on the rest of the ceiling, outside the stain, stays off the quote. So does any joist that turns out wet once the board is down. Those 2 sentences belong under the table, in words, not buried inside "drywall patch."

Example 2: a 650 sq ft basement finish, by phase

The same company, a month later, prices a basement the homeowner wants finished: a family room, a small bath rough-in left for later, and storage along the stair. The floor area to finish is 650 sq ft. The quote is grouped by phase, with a subtotal the homeowner can find without adding the whole page. Prices are this contractor’s, before sales tax.

Ref Description Qty Unit Unit price Total
1 Prep and protection
1.1 Floor and stair protection 1 lot 180 180
1.2 Move stored items 4 hours 55 220
Prep subtotal 400
2 Framing
2.1 Partition walls 80 linear ft 18 1,440
2.2 Soffit framing at the duct 1 lot 320 320
Framing subtotal 1,760
3 Electrical rough-in
3.1 New circuits 4 each 285 1,140
3.2 Recessed lights 8 each 95 760
Electrical subtotal 1,900
4 Insulation and drywall
4.1 Batt insulation at the foundation 650 sq ft 1.40 910
4.2 Drywall, hang and finish 1,800 sq ft 2.75 4,950
Insulation and drywall subtotal 5,860
5 Flooring
5.1 Luxury vinyl plank, supplied and installed 650 sq ft 6.50 4,225
5.2 Baseboard 180 linear ft 4.25 765
Flooring subtotal 4,990
6 Paint and trim
6.1 Walls and ceiling, 2 coats 1,800 sq ft 1.85 3,330
6.2 Interior doors, paint 2 each 140 280
Paint and trim subtotal 3,610
7 Cleanup
7.1 Final cleanup and haul-away 1 lot 420 420
Cleanup subtotal 420
Total before sales tax 18,940
Sales tax per your state and local rules

400 plus 1,760 is 2,160, the electrical subtotal of 1,900 puts the job at 4,060, and insulation with drywall then brings the running total to 9,920. Flooring takes that figure to 14,910, paint and trim take it to 18,520, cleanup adds the last 420, and the total before sales tax is 18,940.

Check a phase the way a homeowner will. 80 linear feet of partition at 18 is 1,440, and the soffit lot of 320 makes the framing subtotal 1,760. 4 circuits at 285 are 1,140, and 8 lights at 95 are 760, so electrical is 1,900. 650 times 1.40 is 910 of insulation, 1,800 times 2.75 is 4,950 of drywall, and those 2 lines together are 5,860. Flooring is 4,225 plus 765, which is 4,990, and paint is 3,330 plus 280, which is 3,610. None of those subtotals is a round number chosen because it looked tidy. Each one is the lines above it.

The deposit is 5,682 at acceptance, which is 30% of 18,940, and it releases the framing lumber and the electrical rough-in material. A 2nd payment of 7,576, which is 40%, is due when the drywall is hung and before the flooring is ordered. The last 5,682 is due when the punch list from the walkthrough is done and the basement is clear. 5,682 plus 7,576 plus 5,682 is 18,940. Sales tax is extra, on its own line, once the rate for this address is known. The price holds for 30 days, because the plank and the doors are ordered, and the supplier will not hold yesterday’s number for a month.

A bath that is only roughed in, or a full finish with a shower, is a different quote. The lines for that room live on a renovation quote template when the basement is part of a larger house, and the paint phase on its own is the shape of a painting quote template. Other trades sit with the construction quote templates by trade.

The exclusions and assumptions under example 2

The insulation price assumes the foundation wall is dry on the day the batts go in. If moisture shows behind the existing wall, or the slab reads wet, the crew stops. A written change order prices the drying, the repair, or both, and that work does not start on a yes shouted from the stairs.

Permit fees stay with the homeowner. The quote includes the drawings the building department asks a contractor to attach, and it does not include the fee the city charges to take the application in.

Light fixtures, the interior doors themselves, and the bathroom fittings the homeowner already bought are owner-supplied. The quote hangs, paints and connects what arrives on site in the spec already written. A fixture that shows up in a different size, or a door that is not the slab the opening was framed for, is a change, priced before anyone cuts.

Those 3 points are sentences under the total. Write them in the truck, before the prices. A heading that only says "exclusions" and then nothing is the same as leaving them off.

What changes between the 2 examples

The repair is mostly unit lines, with 2 lots where a unit would pretend a precision the job does not have. The basement keeps lots for protection, the soffit and the final cleanup, and it prices the rest by the foot, the square foot or the each, because those quantities are what a change order will multiply later. A lump sum of 18,940 for "basement finish" would put the homeowner back on the 1-line quote they already refused.

Skip the lump sum.

The repair has 6 lines and it fits on a page with the exclusions under it. The basement has a line per task inside 7 phases, because a job that runs for weeks gets argued at the phase, not at the total. Someone who wants less recessed light can drop line 3.2 and watch 760 leave the electrical subtotal. They cannot do that to a single number.

A new house runs the same way, with the phases of the shell: earthworks, foundations, walls, roof and windows, each with a subtotal the homeowner can point at. That document is a house construction quotation, phase by phase.

The repair is paid once, when the paint is dry, because nothing was bought for that hallway. The basement has 3 payments, each tied to something you can stand in front of: acceptance, drywall hung, punch list done. How to pick that split, from the money that leaves your account, is in how much deposit a contractor should ask for. An approximate range sent before the walkthrough is a different document, and the gap between the 2 is in estimate vs quote.

5 mistakes these examples avoid

A total with no lines under it, such as basement finish at $38,000, is a price and not yet a quote. The argument starts the morning the homeowner thought paint was inside that number and the walls are still bare.

A missing validity date leaves lumber, plank and a door slab free to move. A quote with no end date is an open offer, and they can bring it back in March at a number the supplier no longer has.

An allowance with no amount, the words "lighting allowance" and a blank where the price should be, is a blank check with a polite name. If the lights are not chosen, leave them out, or write the amount you will supply and what happens above it.

A quote with no exclusion leaves the wet wall, the permit fee and the owner-supplied door unpriced. Those are the 3 fights this basement will actually have, and if they are not sentences on the quote they become free work, or a fight, on the day they show up.

A deposit with no trigger, the words "50% down" and nothing else, does not say what the money releases or what the homeowner can point at before the next payment. 5,682 at acceptance, to order lumber and rough-in material, is a trigger. A percentage floating under the total is not a trigger.

Getting your own quote in this shape from WhatsApp

On the way up the basement stairs, the note goes to Shappy in WhatsApp. Say the phases in job order, with a quantity and a unit on each task: protection as a lot, partitions in linear feet, circuits as a count, drywall in square feet, plank in square feet, paint in square feet, cleanup as a lot. A written message with the same figures, tapped at the light, takes the same path. A photo of the wet corner, or of the stair the stored boxes have to leave by, can go with those lines. That path is photo to quote.

Shappy builds the quote from that note, that message or that jobsite photo, using your prices. Nothing goes out until you validate the draft. Read the phase subtotals the way the homeowner will, then send the PDF in the same chat. The send itself is the construction quote on WhatsApp.

Before the next basement, write the exclusions before you write the prices. Do that in the truck. A 1-line total is how the $38,000 quote ended up on the seat, and the next quote you send should carry the lines, the date and the trigger for the deposit.

Common questions

Can I use these examples as a template?

Copy the shape, the columns and the order of the parts, then replace every price with the one from your own price list for that job.

What should a construction quote include?

A header, the scope, lines with quantity times unit times price, exclusions, a total, a sales tax line, a deposit or a payment schedule, a validity date, and a place to accept.

Should a quote show labor and materials separately?

Split them when the homeowner is supplying a fixture or when a material price can move on its own, and keep a single installed line when you buy it and you set it.

How long should a construction quote stay valid?

14 days on a repair that uses stock already on the truck, and 30 days when lumber, flooring or a special-order item can move, with that date written on the quote.