How Much Deposit Should a Contractor Ask For?

The homeowner says yes on the windows in the thread. The shop wants to be paid when the order is released, and 30% falls short of that order.

8 min readUpdated

Contents
  1. How much deposit should a contractor ask for?
  2. Start from the money that leaves your account
  3. A 3-payment schedule
  4. By type of job
  5. Writing it on the quote
  6. The window quote, built in WhatsApp
  7. Common questions

The homeowner wrote "yes on the windows" in the WhatsApp thread, tape already back in the truck, the old aluminum still sitting in the openings. The vinyl shop wants that custom order paid the day it goes into production, 5 weeks before a single unit is set, and the quote in the thread still shows a deposit of 30%. Those 2 numbers do not meet.

How much deposit should a contractor ask for?

The deposit should cover what leaves your account before the job starts, mainly special-order windows or a rented lift. Plenty of contractors still ask about 30% out of habit. On a materials-heavy job that habit often comes up short, and on a small repair you often skip it. Write the amount and when it is due on the quote.

The windows here are a straight swap. 6 openings and 1 sliding patio door come out, custom-size vinyl goes in, and the shop wants 5 weeks from the day the order is released to the day the units hit the driveway. The bill for that order is due at release. The install is weeks after that.

Start from the money that leaves your account

The prices below are the example contractor’s, before tax. The lines follow the work, from the units themselves to the dump run.

Line Qty Unit Unit price Total
Custom vinyl window, supplied 6 each 720 4,320
Custom sliding patio door, supplied 1 each 1,650 1,650
Remove old units 7 each 75 525
Install, flash and seal 7 each 210 1,470
Interior trim 7 each 60 420
Haul away and cleanup 1 lot 200 200
Total before tax 8,585

Total before tax: 8,585.

6 windows at 720 come to 4,320, and the patio door at 1,650 adds 1,650, so the product ordered before anyone pulls a nail is 5,970. On a total of 8,585, that order is about 70% of the quote, and it leaves the account weeks before the first old frame comes out. Removal, the install with flashing, interior trim and haul-away get paid when they happen: hours on site, sealant, a dump run. A 30% deposit on 8,585 is 2,575.50. The order is still short by 3,394.50.

That gap stays open for the whole lead time. The units are built to these rough openings, grid pattern and color picked at the kitchen table, and the shop will not slide them back onto a standard rack if the homeowner goes quiet. A "yes" in the chat leaves the missing 3,394.50 still unfunded. For 5 weeks the company sits between a shop that has already been paid and a house where no unit is in yet.

The percentage is the result of that addition, not the place you start.

I add the shop order first. The percentage gets read after 5,970 is on the page. On a quote that is almost all labor, the same 30% habit can be more than what actually leaves the account, and only the addition shows which. Asking more at signing can also cost the job, when the next contractor came in lower and the homeowner is comparing percentages on a phone in the driveway, without opening the lines. Walking them through the 5,970 is what this approach costs you in the conversation. Cutting the deposit so it looks usual puts the hole back on your account until the shop is done cutting.

Haul-away stays its own line, a lot at 200. The glass in the old frames is what fills the trailer, and the dump fee barely changes from 6 units to 7. A homeowner who sees tear-out with no haul-away line will expect the debris gone, and you will hear about it the morning the trailer is not in the driveway.

A 3-payment schedule

On the windows I use 3 payments, each one tied to something you can see. 40% at signing, which is 3,434. Another 40% when the units are delivered at the house, 3,434 again. 20% when the install is complete, 1,717.

Step What you can see Share Amount
Signing The homeowner has signed the quote 40% 3,434
Units delivered The units are at the house, under cover 40% 3,434
Install complete All 7 units are in, flashed and sealed 20% 1,717

3,434 plus 3,434 plus 1,717 lands on 8,585. The total checks.

The signing payment is what lets the shop cut vinyl you cannot send back. Delivery is something in front of you: units in the garage, under the carport, or already inside and dry. That payment is due when the units are physically at the house, not when the shop or the carrier announces a delivery week. Install complete means all 7 units are in, flashed, sealed, and the sashes lock. That is where I put the last payment.

A unit can be screwed into the opening and still leak if the flashing is open. The last payment waits for that flashing. It is the unpaid line a homeowner will point at in the first hard rain, and a missing pan is a bad argument once 1,717 has already cleared.

That last amount is mostly the set, the interior trim and the haul-away, so it comes after the work, and you carry the crew’s week until the sashes lock. Interior trim often waits on the painter. If the last payment waits until the rooms look finished, another trade is holding the money, and a coat of paint that is not yours can park that payment long after the sashes work. The fact I write on the quote is install complete.

Counting 5 weeks from the WhatsApp yes is how crews get promised to a house the shop has not started. The shop starts that clock when the order is paid. A week you already half-gave away comes up short if the deposit lands late. I wait for the deposit, and for the shop’s ship week, before I lock anyone onto the job.

Where a local rule caps the deposit on a home renovation, or where a contract type already sets the schedule, I keep the deposit at whatever that rule allows and I move the rest of the 5,970 onto the payment for units delivered at the house. Rules change from one place to another: check yours before you save a default percentage.

Sales tax depends on where the job is and on the work, and it sits outside the total before tax.

By type of job

The contractor who priced these windows skips that deposit on a sash lock. On the jobs he prices, it comes out as 4 cases.

  • Small repair, parts already on the truck: no deposit, and the homeowner pays when the work is done and the tools are back in the truck.
  • A normal job with stock material: a deposit around what that material costs at the supplier.
  • Special-order product: the deposit, then a payment when the delivery is physically at the house.
  • A job that runs for weeks or months: payments tied to stages you can see, and on some jobs a small retainage held until handover.

A roof in special-order metal follows that same split, and the lines live on a roofing quote template. A bathroom that runs for weeks ties the payments to stages you can see, on a bathroom quote template. A whole-house job that mixes those trades uses a renovation quote template.

A sash lock or a failed balance gets paid before the truck leaves the driveway. The parts were already in a bin. Collecting a deposit on that means a second stop, or a chase, for less than the drive was worth. Stock material, a stock interior door or hardware the supplier has on the shelf, only needs a deposit that covers the ticket, because that material can go back if the homeowner cancels. These windows do not go back. The frame is cut to that opening.

On a whole house, spread over weeks or months, each payment sticks to a stage you can stand in front of: a floor that was delivered, a floor that was set. Rain and the shop move dates around, so I leave dates off the schedule. When the homeowner holds a small retainage until handover, it stays small, and it comes off the day you walk the punch list together.

Writing it on the quote

The deposit gets its own line under the total. The line carries the amount, what it covers, and when the money is due. Use this wording.

"Deposit of 3,434 at signing, to release the window order. Work is scheduled once this deposit is received."

Quantity times your unit price is the wall-opening job in how to write a construction quote.

Deposit and down payment refer to the same payment on a lot of jobs, so the line states the amount, what that money covers, and when it is due.

If they balk at 40% up front, a speech about cash flow slides off. The supplied-product line, 5,970, is the number the shop collects to start cutting. When the yes never comes, the chase stays in the same thread, on the schedule in following up a quote on WhatsApp.

If all they have is a range sent before the walkthrough, the deposit waits for the firm quote. How those documents differ is in estimate vs quote.

Lines you repeat from one trade to another sit on the quote templates. The windows keep the measurements taken at the rough openings.

The window quote, built in WhatsApp

On the way out of the house, he sends the job to Shappy, in the WhatsApp thread already open with the homeowner. A voice note carries the opening sizes, the tear-out, the install, the interior trim and the haul-away, in the order he walked them. If he shot the openings, that job site photo goes too, plus 2 lines of text for what the photo leaves out: who hauls the old units, and whether interior trim is in the price. How that photo is used is on photo to quote. The file goes out through the WhatsApp quote.

Shappy builds the lines from his price library, the prices he set, and it puts the deposit and the other 2 payments on the quote. He reads it, checks 6 × 720, and the PDF or the share link goes out after that read. Nothing goes out until you approve.

That read is where a swapped dimension gets caught, 49 inches written as 59, which the shop would cut anyway. A unit that is too wide will not go into the opening, a unit that is too narrow shows up at the flashing, and either way the vinyl is already cut. I do not skip that read on the windows, even when the homeowner is pinging the thread for a number the same evening.

Before you type 30%, add up what you are ordering. To put this schedule on the next window quote, the trial starts from the pricing page.

Common questions

What is a normal deposit for a contractor?

Enough to cover what you pay before the job starts, mainly special-order material. A lot of contractors ask about 30% out of habit, and on a window order of 5,970 that leaves 3,394.50 to carry for 5 weeks. On a repair with the parts already on the truck, I do not collect anything up front.

Should you take a deposit on small jobs?

No, when the parts are already on the truck and the work finishes during the visit. The homeowner pays as you leave. A deposit on a sash lock or a tube of sealant means a second stop, or a chase, for a part that often costs less than the drive.

How do you write a deposit on a quote?

On its own line under the total, with the amount, what it covers, and when it is due. On a window quote that can read 3,434 at signing, to release the shop order, with the job going on the calendar once that money is in.

How do progress payments work on a longer job?

Tie each one to something you can see at the house. On the windows, that is 3,434 at signing, 3,434 when the units are delivered, and 1,717 when the install is complete. On a job that runs for months, each stage you can stand in front of gets its own payment, and a small retainage can wait until handover.

Can you build a quote with a deposit on WhatsApp?

Yes. Shappy builds the quote in WhatsApp from a voice note, a text message or a job site photo, using your prices, with the deposit and the later payments already on it. The review stays with you, a payment can be changed before the send, and the PDF or the share link follows.